Traffic

Click to Interact
Type
Location
Description
Time
construction
Brooklyn BrgWB
Road construction in Area of East River Xings: Brooklyn Bridge on The Brooklyn Bridge WB between The Brooklyn Side and The Manhattan Side
construction
Brooklyn BrgEB
Road construction in Area of East River Xings: Brooklyn Bridge on The Brooklyn Bridge EB between The Manhattan Side and The Brooklyn Side
construction
South StSB
Closed due to road construction in Manhattan on Battery Park Underpass SB between West Side Hwy/Joe Dimaggio Hwy and FDR Dr
incident
PA-32Both NB/SB
Closed due to fallen tree in wires in Solebury Twp on River Rd/PA-23 NB/SB between Fleecy Dale Road and Point Pleasant Pike
incident
PA-32Both NB/SB
Blocked due to Downed Tree in Solebury Twp on River Rd/PA 32 NB/SB between Rt-263/Upper York Rd and Paxson Road. Reported by PENNDOT
incident
RT-9DNB
Fallen tree in Garrison on State RT-9D NB at Durisol Road, slow traffic back to Beverly Warren Road
flow
Montauk BranchBoth EB/WB
Delays of uncertain duration in LIRR on M.T.A./Long Island Railroad: Montauk Branch EB/WB near Mastic-Shirley
incident
I-678NB
Stall quickly cleared in Queens: On The Van Wyck Expy on I-678 (Van Wyck) NB approaching Hillside Ave/X6, heavy but moving back to Jamaica Ave/X6 (NB)
incident
RT-66EB
Closed due to flooding in Neptune on RT-66 EB between RT-18 and RT-35
incident
Northern PkyEB
Police Activity in Westbury on Northern State Parkway EB approaching I.U. Willets Rd/X30, stopped traffic back to Roslyn Rd/X29
construction
Forest AvenueSB
Road construction in Lakewood on Forest Avenue SB after 12th Street and at Carey Street
construction
Forest AvenueNB
Road construction in Lakewood on Forest Avenue NB after 11th Street and at Carey Street
construction
Lower LVL Washington BrgEB
Closed due to road construction in Fort Lee on The G.W.B. Lower Level EB between Lower Toll Plaza and The Alexander Hamilton BR Merge/Split
incident
I-95NB
Accident cleared in Stamford on I-95 NB before Exit 6 Harvard Ave (N)/ West Ave (S), traffic flowing freely back to Exit 5 Rt 1
incident
CT-37Both NB/SB
Reopened in New Fairfield on CT-37 NB/SB between Pine Hill Rd and Chimney Hill Rd
incident
CT-71ABoth NB/SB
Closed in Berlin on rt 71a NB/SB at Reservoir Road
incident
CT-25Both NB/SB
Closed in Newtown on CT-25 NB/SB between US-6/Church Hill Rd/West St and Covered Bridge Road
construction
RT-17NB
Road construction. Right lane closed in Paramus on RT-17 NB between RT-4 and Century Rd
construction
Belt PkyWB
Off-ramp partially closed in Brooklyn on Belt Pkwy WB off-ramp to Verrazano BR/X3
construction
Verrazano Brg Lower LevelEB
Closed due to road construction in Area of The Staten Island Crossings/VZLower on The Verrazzano Bridge Lower Level EB between Staten Island Side and Bklyn Side/Gowanus Ramp
On Air102.3 WBAB - Long Island's Only Classic Rock! Logo

The 102.3 WBAB At Work Network Newsletter